Horizontal Cable to Rail Termination (Fillet) – CX2

Product Information: Horizontal Cable to Rail Termination (Fillet) – CX2 is an exothermic welding mould defined from the LeeWeld PDF catalog. The vari…

Category:

Product Options

 

A (mm²) Rail Size Weld Metal Graphite Mould Type Handle Clamp
50 50 #200 CX2-CL-50 HCR
70 70 #200 CX2-CL-70 HCR
95 95 #250 CX2-CL-95 HCR
120 120 #250 CX2-CL-120 HCR
150 150 #250 CX2-CL-150 HCR

How To Install

How To Install

The AI Weld Process:

Six basics steps in the AI Weld Process lead to a successful exothermic weld:

  1. Six basics steps in the AIWeld Process lead to a successful exothermic weld:
  2. Insert the conductors into the mould cleaned while ensuring that the mould is dry with minimal moisture. This can be ensured either by the process of preheating or possibly a test connection.
  3. Fit the provided metal disc at the bottom of the mould crucible.
  4. Pour in the weld metal completely, which you find under its green lid.
  5. Add on top of the weld metal, the starting powder found under its red cap. Only a small quantity shall be applied on the lip of the mould for easy ignition, then close the lid.
  6. Draw a charge from the flint gun to ignite the starting powder, pull the chargeback immediately after firing in order not to foul the gun.
  7. Caution: Have no part of your body over the top or in front of the aperture
  8. When 20 seconds have elapsed open the mould by crank handle. Use the cleaning brush to remove slag and clean the mould and crucible and lid liberally.

Description

Product Information: Horizontal Cable to Rail Termination (Fillet) – CX2 is an exothermic welding mould defined from the LeeWeld PDF catalog. The variation table, weld powder recommendations, and handle clamp requirements have been synchronized from the source data.

Additional information

Size A

50, 70, 95, 120, 150

Size B

50, 70, 95, 120, 150

Weld Metal

#200, #250

Handle Clamp

HCR